Questions and answers
Can roads, channels and observed water flow use the same arrow?
Streams, ditches, rain-generated surface runoff and still ponds differ. Traditional terms such as incoming water, outgoing water and outlet also need an observation point and scope. A ditch may be a courtyard outlet but an inlet to a larger catchment. Draw boundaries, positions and connections before assigning names, so a distant visible water surface is not confused with the nearby drainage network.
Read the full explanationWhat makes a water-flow record verifiable?
On one base plan, distinguish information with the labels ‘observed on site’, ‘inferred from a drawing’ and ‘reported by someone else’, without using colours to imply fortune. Each arrow’s start, end and date should refer to the same watercourse segment. Leaving unsupported parts blank makes the record easier to verify than drawing an apparently complete flow line.
Read the full explanationIs there a worked example for Observing water: direction, terrain and actual flow?
Suppose you stand on the south side of a courtyard and see an east–west ditch to the north, with a map showing a connection to the main channel at its western end. On a dry day there is no visible flow. Record ‘ditch aligned east–west; mapped connection at the west end’, not ‘measured outflow to the west’. The map describes a connection’s position. Actual flow still depends on conditions, and an underground section may not be verifiable in a surface photograph.
Read the full explanationIdentify the kind of water being observed
Streams, ditches, rain-generated surface runoff and still ponds differ. Traditional terms such as incoming water, outgoing water and outlet also need an observation point and scope. A ditch may be a courtyard outlet but an inlet to a larger catchment. Draw boundaries, positions and connections before assigning names, so a distant visible water surface is not confused with the nearby drainage network.
Terrain and surface conditions both affect runoff
Gravity moves water downslope, while rainfall intensity, slope, soil infiltration and vegetation affect surface runoff. Impervious roofs and paving change collection and drainage. A curved line on a plan cannot by itself establish flow speed or ponding likelihood. Record levels, channel connections, obstructions and differences between dry and rainy conditions; use professional measurement where needed.
Worked comparison: does a westward channel necessarily flow west?
Suppose you stand on the south side of a courtyard and see an east–west ditch to the north, with a map showing a connection to the main channel at its western end. On a dry day there is no visible flow. Record ‘ditch aligned east–west; mapped connection at the west end’, not ‘measured outflow to the west’. The map describes a connection’s position. Actual flow still depends on conditions, and an underground section may not be verifiable in a surface photograph.
On another visit from a safe location, you may observe floating material moving west over a short stretch after rain. Record that visible surface movement for that stretch and time, with a photo or clip. It alone does not establish velocity throughout the channel, drainage capacity or freedom from backwater during a storm. Keep both the dry-day and post-rain records. Assessing capacity requires system information and an appropriate professional evaluation.
Label the evidence behind each flow arrow
On one base plan, distinguish information with the labels ‘observed on site’, ‘inferred from a drawing’ and ‘reported by someone else’, without using colours to imply fortune. Each arrow’s start, end and date should refer to the same watercourse segment. Leaving unsupported parts blank makes the record easier to verify than drawing an apparently complete flow line.
- Observed on site: viewpoint, time, recent rain, visible water surface and movement direction. Record only what is visible from a safe place; do not enter the water or lift access covers to verify it.
- Inferred from a drawing: drawing name, version, shown slope or connection. Keep unverified buried pipes, pump operation and outlet conditions marked unknown rather than filling them in with a blue line.
- Reports and follow-up: state who supplied the information and which ponding event they described. Wall watermarks are clues for investigation, not sufficient evidence of flood level or source. List connections, cleaning or repairs requiring verification by property management separately.
Keep cultural descriptions separate from site conclusions
Traditional descriptions such as encircling, straight outflow and convergence can serve as shape vocabulary; attached claims about wealth or descendants form a separate interpretation. Site conclusions should trace back to photographs, slope, rain marks and drainage connections. If movement was not observed, write “flow direction unconfirmed” instead of inferring it from a bend. Ponding prevention and drainage capacity depend on actual conditions and professional design.
Sources and further reading
These sources help clarify the concepts and their origins. Explaining a traditional term does not establish that it can predict outcomes.